Your land has more power needs than your house.

Wells, pivots, stock tanks, the shop, the barn, and three meters on two co-ops make rural solar a different project from a suburban roof. Size yours around the loads that actually run, see what land it takes, and find out which financing path your operation qualifies for before an installer shows up.

Where the kilowatt-hours go on a working property

50 HP irrigation well, one season≈ 50,000 kWh
Milk cooling and cold storage≈ 40,000 kWh
House and domestic well≈ 13,500 kWh
Shop with welder and compressor≈ 6,000 kWh
Two stock-tank heaters, one winter≈ 3,000 kWh
Typical annual figures. The pivot usually decides the project.

Rural solar project planner

Check what runs on your property, tell us about meters and your bill, and get a first-pass system size, land footprint, and financing pathway. It's a planning estimate so your installer conversation starts with real numbers, not a sales script.

What runs on the property

About the property

House, well, shop, and pivot are often separate meters, sometimes on different utilities.
Optional. Used as a cross-check against the load estimate.

Your estimate

Annual usage covered0kWh
System size0kW DC
Ground-mount footprint0acres
Panels, roughly0× 450 W
Check a few loads to start.
    Send this plan to an installer

    Assumes about 1,500 kWh per kW-DC per year for a well-sited Colorado ground mount and roughly a quarter acre per 40 kW. Typical equipment figures; your meters tell the real story.

    What's different about a rural project

    A suburban installer's checklist stops at the roof. These are the items that decide cost and timeline on acreage, and an installer who does rural work will raise them before you do.

    Long runs and trenching

    The best ground for an array is rarely next to the meter. Every hundred feet of trench and conductor is real money, and voltage drop over long runs changes the wire size. Ask for the trench length as its own line item.

    Transformer and service capacity

    A 60 kW array on a service fed by a 25 kVA transformer means a utility upgrade, which the co-op may bill to you. Getting the transformer size early avoids a redesign after the quote.

    Co-op interconnection and REA paperwork

    Each cooperative has its own net-metering cap, aggregation rule, application, and study fee. Your installer should name the policy, not promise "net metering" in general.

    Ground mount, pole mount, or roof

    Ag roofs are often light steel with no engineering record. Ground mounts cost more per watt but sit at the right tilt, wash down easily, and don't care about the barn's condition.

    Dust, wind, and shading

    Field dust and pivot overspray cut production until it rains or you rinse. Eastern Plains wind drives racking choices. Shelterbelts shade more than they look like they do in winter.

    Seasonal demand

    Irrigation runs June through September; stock tanks run December through February. Annual net metering averages this out, monthly netting does not, so the co-op's rule changes what size pays.

    Incentives, as they stand in October 2026

    USDA REAP

    The Rural Energy for America Program covers agricultural producers and rural small businesses. Grant windows open and close and funding changes; guaranteed loans have continued. We say "check the current status," not "apply now," and so should your installer.

    Federal business investment credit and depreciation

    Systems owned by a business, including a farm or ranch operation, may qualify for the federal investment credit plus accelerated depreciation. Deadlines and construction-start rules matter, so get a tax professional who works with ag involved early.

    Federal 30% homeowner credit

    Ended for systems installed after December 31, 2025. For the house portion of a property, a leased or third-party-owned system may still carry a credit claimed by the installer.

    Colorado and your co-op

    Qualifying solar equipment is exempt from state sales tax; some local taxes still apply. Co-op rebates and net-metering credit rates vary by utility and change, so they go into the quote by name.

    This section is dated and we keep it that way. Spot something stale, email hello@coloradosunharvest.com.

    Questions we hear from property owners

    Can one array offset several meters?

    Sometimes. Some Colorado co-ops allow meter aggregation, where one array's credits apply across meters on the same property. Others require an array per meter or don't offer aggregation at all. The planner flags this; your installer confirms the rule with your co-op before drawing anything.

    Is REAP open right now?

    We don't assume so. Grant windows open and close and the funding level changes year to year, while guaranteed loans have stayed available. Ask your installer for the current notice from USDA Rural Development.

    How much land does a ground mount take?

    Roughly a quarter acre for a 40 kW array, or 5 to 6 acres per megawatt, depending on row spacing, tilt, and access lanes. Most residential-scale systems fit in a corner of a yard or a pasture edge.

    Can I keep grazing or farming around it?

    Often. Sheep graze under arrays routinely; cattle need taller racking and sturdier fencing. Cropping between rows is possible with wider spacing and a design that plans for equipment turns.

    Who contacts me, and what do you get out of it?

    One licensed Colorado installer from our network who does ground mounts and ag loads, by the method you choose. Partner installers pay us a referral fee when they service a request. You never pay us and it doesn't change your quote.

    Request a rural project consultation

    An installer who does ground mounts, ag loads, and co-op paperwork reviews your plan and your meters, then gives you a real design and price. No obligation.

    • Your planner estimate goes with the request, so the first call starts with your loads and meters.
    • One installer contacts you, by the method you pick.
    • Free, and the installer's fee to us never changes your price.